28 Grand River

After assessing material options, the design team chose to work with Kerkstra to build a total precast structure. According to Malek Eljizi, project director with Bedrock, this was the only material that made sense. “By bringing Kerkstra on board during the design phase, we were able to adapt the building to fit the location and its intent.” shares Malek Eljizi, Project Director with Bedrock.

State

Michigan

City

Detroit

Architect

Kraemer Design Group

Completed

2017

Contractor

Walbridge Aldinger

Thanks to the embedded brick veneer option offered by Kerkstra, the building looks like a conventionally bricked building.

Blake Drouillard Architectural Designer, Kraemer Design Group